|
|
|
|
|
Sollevamento |
| |
|
IMMAGINE |
DESCRIZIONE |
PDF |
|
 |
BRIDGE BRIDGE TRESTLE FOR RAIL
REPLACEMENT CAP 5
Replacing rails is particularly easy with the CAP 5 bridge
trestle that only requires two operators to run. |
 |
|
 |
TELESCOPIC CRANES FOR MOVING 36 MT
LONG RAILS GMR 7
Telescopic cranes GMR 7 can operate in three different ways:
- recovery of 36m long rails
left on either side of the track by the rail replacer.
- in-station pick up of
rails (set of five) from wagons on the adjacent track.
- setting up and recovery of
the service track.
Telescopic cranes GMR 7 are
controlled by means of a push-button unit that can be made to:
- jointly control of alla
cranes.
- singol control of each
crane.
|
 |
|
 |
CRANE MOUNTED ON THE MOBILE UNIT
GRC |
 |
| |
To contact us:
 |
|